Nasal Test Location (0)
Sewer Control Valves (2)
| Air Release |
| Other |
| Siphon Breaker |
| Unknown |
Sewer System Valves (3)
| <all other values> |
| Duckbill |
| FlapGate |
| Other |
| Tideflex |
| Unknown |
| WaStop |
Sewer Pump Stations (4)
Sewer Structures (5)
| Notify GIS |
| Manhole (Gravity) |
| Splice |
| Manhole (Main Trunk) |
| Hybrid (MH/CB) |
| Common MH |
| Storm Manhole |
| Catch Basin |
| Lamphole |
| Cleanout |
| Junction Chamber |
| Proposed Structure |
| Proposed Manhole |
| Proposed Catch Basin |
| EQ Tank |
| Diversion |
| CSO KPDES Outfall |
| Flush Tank |
| Valve Vault |
| Hatch |
| Pump Station |
| Solids/Floatable Control |
| Lift Station (Flood) |
| Treatment Plant |
| Tunnel Shaft |
| Gate Structure |
| Grit/Screening |
| Inlet/Outlet Culvert |
| Plug |
| Abandoned Structure |
| Stub |
| Tee |
| Blind Connection |
| Valve Box |
Sewer Lines (6)
| Notify GIS |
| Abandoned Line |
| Gravity Line |
| Force Main |
| Lateral Line |
| Main Trunk Gravity |
| Storm Line |
| Proposed Pipe |
| Proposed Force Main |
| Proposed Replacement |
| Proposed Abandoned |
| Tunnel |
| SW Detention Vault |
| Equalization Tank |
| Hidden outfall in storm |
Storm Structures (8)
| Manhole |
| Catch Basin |
| Pipe Inlet |
| Pipe Outlet |
| Control Structure |
| Culvert Point |
| Storm Pump Station |
| Post Construction BMP |
| Bridge |
| Stub |
| Proposed Catch Basin |
| Proposed Manhole |
| Proposed Structure |
| EQ Tank |
| Surface Inspection |
| Splice |
| Abandoned |
Storm Lines (9)
| Notify GIS |
| Abandoned Line |
| Pipe |
| Storm Force Main |
| Culvert Pipe |
| Storm Lateral |
| Inferred Pipe |
| Underdrain Pipe |
| Underground Detention |
| Roadside Ditch |
| Channel |
| Proposed Pipe |
| Proposed Force Main |
| Proposed Replacement |
| Proposed Abandoned |
BMP Site Assets (10)
| Lake Pond |
| Reservoir |
| Discharge to MWW |
| KPDES |
| Monitoring Well |
| Sign |
| Permeable Concrete |
| Bioretention Basin |
| Detention Basin |
| Extended Detention Basin |
| Gravity Separator |
| Green Roof |
| Manufactured Device |
| Media Bed Filter |
| Nature Park |
| Permeable Asphalt |
| Permeable Pavers |
| Planter Box |
| Rain Garden |
| Retention Basin |
| Swale |
| Vegetated Swale |
| Filtration Swale |
| Wetland |
BMP Sites (11)
Equipment (12)
| Wireless Flowmeter |
| Wireless Rain Gauge |
| Flowmeter |
| Rain Gauge |
| Surcharge Indicator |
| Biofilter |
| Gate |
| Flood Gate |
| Back Flow Valve |
| Chemical Feed |
| Small Treatment Plant |
| Grinder |
Easements (13)
| Status Missing |
| Acquired |
| Condemnation |
| Negotiation |
| Pending |
| Prescriptive |
| Proposed |
| Quitclaim |
SD1 Facility Assets (14)
SD1 Buildings (15)
SD1 Facility Sites (16)
Addresses (17)
|