Nasal Test Location (0)
Addresses (1)
Overflow View with Transactions (2)
| CSO, Active |
| CSO - To Be Permitted, Active |
| CSO, Eliminated |
| Diversion |
| Pump Station |
| SSO, Inactive-M |
| SSO, Inactive |
| SSO, Recurring |
| SSO, Eliminated |
Sewer Control Valves (3)
| Air Release |
| Other |
| Siphon Breaker |
| Unknown |
Sewer Nodes (4)
| <all other values> |
| Cap |
| Reducer |
| Tap |
| Tee |
| Unknown |
Sewer System Valves (5)
| <all other values> |
| Duckbill |
| FlapGate |
| Other |
| Tideflex |
| Unknown |
| WaStop |
Sewer Pump Stations (6)
Sewer Structures (7)
| Notify GIS |
| Cleanout |
| Flush Tank |
| Lamphole |
| Manhole (Gravity) |
| Manhole (Main Trunk) |
| Hybrid (MH/CB) |
| Common MH |
| Storm Manhole |
| Catch Basin |
| Junction Chamber |
| Diversion (CSO) |
| CSO KPDES Outfall |
| Valve Vault |
| Hatch |
| Pump Station |
| Solids/Floatable Control |
| Lift Station (Flood) |
| Treatment Plant |
| Tunnel Shaft |
| Gate Structure |
| Grit/Screening |
| Inlet/Outlet Culvert |
| Plug |
| Abandoned Structure |
| Stub |
| Tee |
| Blind Connection |
| Valve Box |
Sewer Lines (8)
| Notify GIS |
| Hidden outfall in storm |
| Abandoned Line |
| Gravity Line |
| Force Main |
| Lateral Line |
| Main Trunk Gravity |
| Storm Line |
| Proposed Gravity Replacement |
| Proposed Gravity Line |
| Proposed Force Main |
| Tunnel |
| Proposed Tunnel |
| SW Detention Vault |
| Equalization Tank |
BMP Sites (9)
BMP Site Assets (10)
| Lake Pond |
| Reservoir |
| Discharge to MWW |
| KPDES |
| Monitoring Well |
| Sign |
| Permeable Concrete |
| Bioretention Basin |
| Detention Basin |
| Extended Detention Basin |
| Gravity Separator |
| Green Roof |
| Manufactured Device |
| Media Bed Filter |
| Nature Park |
| Permeable Asphalt |
| Permeable Pavers |
| Planter Box |
| Rain Garden |
| Retention Basin |
| Swale |
| Vegetated Swale |
| Filtration Swale |
| Wetland |
Storm Structures (11)
| Control Structure |
| EQ Tank |
| Post Construction BMP |
| Storm Pump Station |
| Bridge |
| Catch Basin |
| Culvert Point |
| Manhole |
| Pipe Inlet |
| Pipe Outlet |
| Splice |
| Stub |
| Proposed Catch Basin |
| Proposed Manhole |
| Surface Inspection |
| Abandoned |
Storm Lines (12)
| Underdrain Pipe |
| Storm Force Main |
| Roadside Ditch |
| Underground Detention |
| Channel |
| Culvert Pipe |
| Pipe |
| Proposed Pipe |
| Inferred Pipe |
| Abandoned Line |
| Storm Lateral |
Equipment (13)
| Wireless Flowmeter |
| Wireless Rain Gauge |
| Flowmeter |
| Rain Gauge |
| Surcharge Indicator |
| Biofilter |
| Gate |
| Flood Gate |
| Back Flow Valve |
| Chemical Feed |
| Small Treatment Plant |
| Grinder |
Easements (14)
| Status Missing |
| Acquired |
| Condemnation |
| Negotiation |
| Pending |
| Prescriptive |
| Proposed |
| Quitclaim |
SD1 Facility Assets (15)
SD1 Buildings (16)
SD1 Facility Sites (17)
Centerline (18)
|